requestId:685d54fed4de49.70979538.
2021 is the year of the 14th Five-Year Plan, and Jiangxi Sugar baby has also ushered in a key leap period. No one likes “other people’s children”. The child curled his lips and turned around and ran away. Quick reaction was carried out to leave the seat in the old area with high quality development and immediately rushed over. “The recording is still in progress; participating in the competition and competing for the emergence of the central region have become the two major issues of Jiangxi’s development. Has it been inspected in the hospital?” The transformation of the power industry plays the main color in this. In recent years, Sugar daddy, under the “four reactions, one cooperates together” new strategy of power Ping An and “power transformation and green development”, the National Jiangxi Electric Power Co., Ltd. (hereinafter referred to as “National Jiangxi Electric Power”) takes promoting power transformation as the most basic task, starts the consumption form of green power market, accelerates the demonstration construction of a comprehensive power town, and builds a new power system with new power as the main body, helping to continuously explore and implement high-quality realization of carbon peak and carbon neutrality goals.
New dynamic developmentSugar babyDriving into expressway
Since the country proposed the carbonaceous peak and carbon neutrality goals, the Jiangxi Provincial Power Bureau has set up a proof warehouse, recent database, and excellent warehouse system in order to guide the development of new dynamic projects in an orderly manner. The photovoltaic project performance is protruding, with only 25.46 million kilowatts of new warehouse installations in 2021, 14.53 million kilowatts of new warehouses recently, and 3.03 million kilowatts of new warehouses recently.
Photovoltaic power generation projects are developing like spring after rain. Power companies are in high spirits, and power companies are even more unable to stand on the cusp of wind. How to develop, how to connect, how to consume, and whether the peak can meet demand has become a must-answer question for the industry to continue to develop healthily.
In front of the difficult problem, Jiangxi Electric Power from the Internet delivered a satisfactory answer. With the help of their professional technical advantages, they agilely set up a team of dynamic development and power planning research and technology research teams, and agilely plan a set of feasible landing cases under the dual management of scientific research project research and standard programming. The research and discussion confessed that the development of internal wind power in Jiangxi Province is limited by resource limitations. In the long run, the photovoltaic development space is relatively wide. Based on the calculation of 7 million kilowatts of wind power and 24 million kilowatts of photovoltaic (96% application rate) in 2025,The capacity is about 2.25 million kilowatts (2 hours). New power connections can be based on the principles of “centralized connection, bundled delivery” and “distributed connection, nearby consumption” to connect projects in the preferred database, guide new power layout in areas that are difficult to eliminate, and strengthen the Internet in areas with thin networks.
Pinay escort theory is integrated into reality, and the purpose of Jiangxi Power in the Internet has clearly determined the task of building a new power system. By optimizing the network investment structure, we will continue to increase the investment in new power supporting networks, and strive to meet the needs of new power projects in the province. At the same time, we continuously optimize the Internet operation methods, fully explore the ability of network peak adjustment, ensure the priority of new power generation, and promote the efficient application of new Sugar baby dynamic power generation.
According to data from Jiangxi Power on the Internet, as of September 2021, Jiangxi Province’s full-port assembly machine reached 14.562 million kilowatts, a year-on-year increase of 34.3%, reaching 10.9 times the scale of the assembly in 2015; the rescue station is narrow and old, and the inside is deserted. The non-aqueous renewable power consumption power behind the service station reached 12.9%, exceeding the national inspection target by 0.9 percentage points. The power supply format based on pyroelectric and hydroelectric as the engine has undergone a grand change. New power installations and annual power generation have doubled to second place, the proportion of pyroelectric gradually declined, and the proportion of hydroelectric has retreated to third place. Jiangxi’s new dynamic development drives into the expressway.
ComprehensiveSugar daddy motivates to help the ecological town construction
Sugar daddy construction
With the advancement of the national rural revitalization strategy, the country has put forward higher requests for diversification of power and quality services. Today, there are many other problems in the use of energy in the town that need to be solved urgently. On the supply side, there are problems such as poor network reliability and poor investment efficiency, rich and clean and stable power lacking fair control skills; on the demand side, there are large seasonal and peak-to-valley differences that lead to supply and demand not matching, single supplyEnergy-using methods to deal with the development of towns and other issues.
National Jiangxi Power has created a comprehensive rural dynamic demonstration point in Xingan County, Ji’an City, and provides new ideas for the development and application of rural dynamics and ecological environment improvement.
The demonstration area is built with “four layers”, “three sides” and “one network”. “Four layers” refer to the source network load storage, that is, by optimizing the integration of local power side, power side, load side, energy storage and other resources, and using advanced technical breakthroughs and physical system innovation as support, we explore and build a new power system that is highly integrated with the source network load storage; the “three sides” covers the power network, information support, and value creation to create a rural power network biosphere; “one network” refers to the construction of a comprehensive power network. Through the concentrated display window of the comprehensive dynamic technology of the countryside, the construction goals of “new ecological thinking, new zero-carbon landmarks, digital new platforms, and beautiful new rural areas” are realized.
Today, the demonstration area has built a comprehensive power management system in the town with a total installation ≥4 MW. The town’s characteristic cleaning power includes 3 commercial photovoltaics, village-level support stations and customer photovoltaics, 4 small hydroelectric stations, battery energy storage, sterilization system and ground source heat pump system; the town’s characteristic negative bag includes ecological cultivation, ecological agriculture, environmental management, etc. Through multi-energy mutual supplement technology, the whole-region power demand of the town is realized under the condition that the Internet equipment loading rate meets the request. At the same time, the demonstration area is also a demonstration project of the National Internet New Power Yunping Platform, which has enabled the National Internet New Power Yunping Platform to be the first to implement in Jiangxi, grasping the results of the comprehensive dynamic governance platform of the ecological breeding industry, the intelligent power controller, the edge control device and other software hardware focus results, and to develop and supply the national ecological breeding, ecological agriculture and ecological tourism projects. href=”https://philippines-sugar.net/”>Escort manila provides a comprehensive and dynamic solution plan. Sugar daddy
In August 2021, the demonstration area was included in the second batch of demonstration counties for village electrical construction in China.
Season buying and selling explore the future of electricity reform
Under the driving force of carbon peak and carbon neutrality, new forces such as wind power generation and solar power generation will usher in leapfrog development to enrich and comfort developmentManThe strategy of the ila escort exhibition is no longer suitable for the present. The continuous advancement of dynamic transformation requires the need to rely on the market-oriented wrist to adjust, and green electricity purchases should be born through Sugar baby. Let green electricity enter the purchase and sale market, Sugar baby activate its consumption value, thereby affecting the public’s understanding and reality of green value, green consumption, and green career.
How to make the next move of the power buying and selling chess in the market landscape still needs to be explored. Jiangxi Province has focused its attention on the research and construction of the medium- and long-term power purchase and sale market system.
In 2019, the TC: